How much work was done if the power developed during Esuke’s descent was 501.3 W?
Reginald Esuke from Cameroon ran over 4 km down a mountain slope in just 58.51 min. How much work was done if the power developed during Esuke’s descent was 501.3 W?
Reginald Esuke from Cameroon ran over 4 km down a mountain slope in just 58.51 min. How much work was done if the power developed during Esuke’s descent was 501.3 W?
1 Answer
Apr 7, 2018
Explanation:
#"Power" = "Work"/"Time"#